Between April and June 2015 Gary was able to acquire and install a larger Brewing System to include several large Fermentation tanks. During this time brewing capacity went from 1bbl (30 gallons) to 3bbls (90 gallons) per batch. This was accomplished by installing a gas fired 3bbl brew system, 3 5bbl fermentation tanks, 1 3bbl fermentation tank and 1 3bbl brite/conditioning tank.
Back to timeline